The scheme is progressing rapidly, the 2m high wall has been reduced down to 70cm, and has opened out the views to the surrounding countryside.
The raised planters have been built and the sett detailing has been laid. The fine tilth is being prepared ready for the turf.
The walls have been rendered and are drying out, ready to be painted. We are hoping that the dry weather will continue and allow us to complete the painting within the next few days.
The lighting cable has been installed, ready for connecting up the lights next week.
The large curved glass screen has been ordered for the water feature.... there is plenty of detailed design work to be done on this! .... never a dull moment!
This is the view towards the house, in the background is the recently rendered outside kitchen area and in the foreground, the proposed play area, with it's timber sleeper walkways currently under construction.
This area is to receive artificial turf, and the final stage of preparation is underway!
This is the view towards the house, in the background is the recently rendered outside kitchen area and in the foreground, the proposed play area, with it's timber sleeper walkways currently under construction.
This area is to receive artificial turf, and the final stage of preparation is underway!
0 comments:
Subscribe to:
Post Comments (Atom)